Asbestos removal options
Asbestos popcorn ceiling removal
A stippled ceiling tells you nothing about what the coating contains, so in SeaTac rentals and houses alike we sample the texture and any paint or patch the work will reach. One result doesn’t carry over to another. The lab results then name the exact ceilings to scrape, unit by unit or room by room. After that we seal the space, mist and scrape the texture, clean up and leave the skimming and painting to your painter.
Asbestos floor tile and mastic removal
In a SeaTac kitchen or bath, the tile, the backing under sheet vinyl and the adhesive may each test differently. Color and tile size won’t settle it, so we sample every layer the job will reach. Give us the rooms or units that are changing and anything you know about floors laid over or repaired before. We then mark which floors come up and which subfloor stays, and settle with you who repairs and prepares it for the new flooring.
Asbestos insulation removal
Heating pipes, boilers and loose attic fill are different jobs, so we look at where the insulation is, what condition it is in and what your work will touch. On a pipe, the elbows and fittings may be wrapped in something other than what covers the straight runs, so we mark where our work starts and stops. Leave suspect insulation alone until results are in. If the heat has to be shut off, we plan access and the shutdown with whoever is doing the pipework.
Asbestos siding and roofing removal
Cement siding and older roofing are tested before any opening is cut or new siding starts, since looks alone won’t tell you what is in them. We check each side of the building, the layers hidden underneath and whether windows, trim or a neighboring structure shift the stopping point. The siding comes off whole and is hauled away, and we settle who keeps the wall covered until the new material is on. We fit the removal to your siding or roofing job, most of all where an opening or a hidden layer will be exposed.
Asbestos abatement before renovation and demolition
A remodel and a full tear-down need different surveys. For a remodel we test what the work will touch; for a demolition, the whole building and any outbuildings. Show us the plans before anything is opened. A small update may disturb only a little material, but that patch still matters, so we mark what comes out and what stays untouched. Then we put the results, any agency notice and the removal order together and tell your builder when each area is ready.
Commercial asbestos abatement
Apartment buildings and business spaces near the airport can have people in them while we work. For a suite remodel we need the full set of plans, because the ceilings, floors and partitions that come out may sit beside a tenant who stays open. A room-by-room list can miss the shared hallways, air systems and delivery doors, so we go through those as well, fit the survey and removal to the building’s use and settle the records the owner, tenants and next trades will need.
What the building is used for
Beyond the airport and its businesses, SeaTac has neighborhoods such as Angle Lake and McMicken Heights. A family house, a rental and a business unit are three different jobs, so we ask at the start what the building is and who uses it.
For a business or shared building, show us the hallways, delivery doors, mechanical rooms and any areas that have to stay open, along with any rules the owner or facility manager sets. For a home, mark the rooms and surfaces your remodel will touch. A house near the airport is still a house, so we don’t use a commercial or airport plan for it.
Before we come out
List all the work
A unit number or room name doesn’t tell us what the work is. Send us the full list of what will be cut or pulled out, any layers hidden under newer finishes and any structure outside the main building. Earlier reports are worth having, but check they cover this job, since one result from one unit or room doesn’t speak for the whole building. If a plan changes partway, call us before the work reaches the new area.
Settle who handles what
Where the work area sits beside people’s homes or a working business, we go over with you where it starts and stops, how tenants and staff get past it and what stays closed. We also sort out, before the schedule is set, who manages the agency notice, the waste and the repairs afterwards, especially when several companies are on separate contracts.
Records for the owner
Waste paperwork, our final visual check and any clearance air test are separate records, each with its own purpose. When a unit or space is done, we hand you the ones that apply to the job and tell you what material stays in the building and what the next trade may disturb. File them with the building papers so a later remodel has something to start from.
Survey and project requirements in Washington
A building permit is not an asbestos survey. Puget Sound Clean Air Agency publishes separate guidance for remodels and tear-downs, so on a SeaTac job we confirm the survey, the notices and the disposal plan.